Electric

Electricity distribution service to workplaces in the region is provided by OIZ.In accordance with the Electricity Market Law No. 4628 and relevant legislation, the 24th Amendment of the Energy Market Regulatory Board.03.With the decision dated 2011 and numbered ED-OSB/3127-1/1885, FATSA OSB was granted an Electricity Distribution License for 49 years.In this way, the National Tariffs determined by EMRA have been switched from Tariff No. 4 to Tariff No. 1, and 25% cheaper energy supply has been provided to our industrialists in accordance with the agreement we made with the supplier.There is 1 Main Distribution Center and 3 Transformer Centers within the borders of the OIZ.Our OIZ has an installed capacity of 6.5 MVA.OIZ's electricity comes from Fatsa Transformer Center 3.770 meters underground, 2.6 in total, including 730 meters of overhead lines.It is fed by a separate, redundant MV cable that reaches our region at a distance of 500 meters and belongs to us.Electricity operation and maintenance and repair of the network are carried out by the OIZ Directorate.The MV and LV within the OIZ and the entire electrical network are in the form of overhead lines.In this way, malfunctions that may occur can be responded to more quickly.Overhead line exits have been installed up to all parcel entrances.According to 2015 data, 1.5 million kWh of electricity is consumed monthly in Fatsa OIZ.There are a total of 75 lighting poles on the avenues and streets of our OIZ.

PRE-REQUEST FORM